ABOUT US
Flood Mitigation Engineering.
Independent Judgment.
FloodReady helps owners, operators, and project teams identify property-wide flood exposure, engineer mitigation strategies, navigate municipal permitting, and coordinate site integration.
Shimi Tzobery, M.Sc., PE, CGC
FloodReady Founder, President & Chief Engineer
“Flood mitigation is not a product decision.
It is an engineering judgment.”
Shimi Tzobery, M.Sc., PE, CGC
Professional Background
Shimi Tzobery is a Professional Engineer licensed in Florida, New York, and California and a Florida Certified General Contractor, with more than 33 years of engineering and construction experience across complex infrastructure, commercial, institutional, residential, and flood mitigation projects in the U.S. and internationally.
Today, that experience is focused exclusively on flood mitigation, combining structural engineering, constructability, permitting, and site integration to help owners and project teams make informed, property-specific mitigation decisions.
Shimi’s LinkedIn Profile ➤
Professional Licensure, Education and Industry Recognition
Florida Professional Engineering (PE #103486), California and New York PEs
Master’s Degree (M.Sc.), Engineering, Colorado School of Mines
Florida Certified General Contractor (CGC #1539264)
Registered as a local General Contractor in 15 municipalities across Florida
ACEC and CMAA recognized Project Engineering Excellence Awards
Click on selected certificates to enlarge
Why FloodReady Exists
FloodReady was created around one principle: understand the property first, then engineer the mitigation strategy.
Our Engineering Leads the Work
Flood Mitigation Technical Briefing | City of Naples Building Departments
We brings more than 30 years of engineering and construction experience to Florida, with direct engagement in local municipal building departments and industry professionals on evolving flood mitigation standards, permitting strategies, and engineering challenges.
What We Do
FloodReady provides a disciplined technical path for flood mitigation across the properties and sectors we serve.
Flood Risk Assessment
Evaluate exposure, elevations, vulnerable conditions, structural constraints, and operational needs
Engineering Design
Develop PE-led documentation for flood loads, anchorage, load path, code compliance, and system interfaces.
Permitting Coordination
Coordinate permit strategy, deferred submittals, signed and sealed documentation, and plan reviews.
Site Integration Coordination
Manage system coordination, procurement, field logistics, installation interface, training, and readiness.
Trusted Partners. Technical Leadership.
Local knowledge, engineering judgment, and permitting expertise for flood mitigation projects across Florida.
Where We Operate
Based in Naples, FloodReady brings local knowledge and direct regional coordination to flood mitigation projects across Florida.
Explore Our Primary Florida Regions:
Naples, Marco Island & Collier County →
Fort Myers, Cape Coral & Lee County →
Our Mission & Principles
Engineering stronger flood resilience through independent judgment, disciplined execution, and long-term readiness.
Integrity
Independent judgment. Clear accountability.
Discipline
Precise execution from analysis through implementation.
Excellence
Thoughtful work built for long-term resilience.
Engineering Judgement
Experience applied to complex technical decisions.

