FLOOD MITIGATION. ENGINEERED. PERMITTED. CONSTRUCTED.
Fort Lauderdale, Hollywood & Broward County
Property-Wide
Flood Mitigation
Engineering
Cost-effective flood mitigation, engineered, permitted, and constructed under one coordinated scope.
30-minute consultation. No obligation.
30-minute introductory consultation. No obligation.
Engineering-Led
Florida Licensed
Permitting Focused
Led by a Florida Professional Engineer and Certified General Contractor, FloodReady brings engineering judgment, permitting expertise, and construction coordination to flood mitigation across Broward County.
What We Do
One coordinated path from understanding your flood exposure to implementing the flood mitigation measures.
Flood Risk Assessment
Evaluate property-wide flood exposure, vulnerable pathways, structural limitations and operational needs.
Engineering Design
Select appropriate systems across manufacturers and engineer their structural requirements, anchorage and integration.
Permitting Coordination
Establish permitting strategies, prepare signed and sealed documentation and navigate municipal permit approval.
Construction & Site Integration
Deliver procurement, construction, installation, quality control and project closeout.
Local Flood Exposure Matters
Flood mitigation in Fort Lauderdale, Hollywood, and Broward County extends beyond coastal storm surge. Extreme rainfall, king tides, high groundwater, and constrained drainage systems create overlapping flood risks.
From the Intracoastal Waterway and Hollywood Beach to inland commercial districts, site elevations, drainage pathways, and local permitting requirements vary. Property-wide engineering assessment is essential before selecting mitigation measures.
Flood exposure varies by elevation, location, building use, and applicable floodplain requirements. Map shown for general planning context only.
02
Property-Wide Vulnerabilities
Floodwater can reach garages, elevator pits, and electrical rooms through drainage, sewer, and utility pathways beyond building openings.
Area-Specific Challenges
Local knowledge strengthens flood mitigation decisions from early planning through permitting and implementation.
01
Extreme Rainfall & Tidal Flooding
03
Municipal Permitting Complexity
Local permitting requirements can significantly influence flood mitigation design, project costs, and construction schedules.
03
Municipal Permitting Complexity
02
Property-Wide Vulnerabilities
01
Extreme Rainfall & Tidal Flooding
Intense rainfall, king tides, storm surge, and elevated groundwater can overwhelm drainage and expose low-lying properties.
04
Constrained Coastal & Urban Sites
Existing structures, canals, utilities, limited access, and staffing capabilities influence system selection, construction, and deployment.
04
Constrained Coastal & Urban Sites
LOCAL CONDITIONS MATTERS
Our Engineering Leads the Work
Flood Mitigation Technical Briefing | City of Naples Building Departments
Shimi Tzobery, M.Sc., PE, CGC, Founder & Chief Engineer of FloodReady, brings 33+ years of engineering and construction experience.
A Florida Professional Engineer, Certified General Contractor and technical adviser to the City of Naples on flood mitigation, he leads projects from flood risk assessment through construction closeout.
Trusted Partners. Technical Leadership.
Local knowledge, engineering judgment, and permitting expertise for flood mitigation projects across Sunny Isles Beach and Miami-Dade County.

